From what is now occurring, and having the boardwalk view closure in fall and standard view in Jan and Feb, it is likely the room renovations will be a three step procedure: (a) doing the boardwalk view rooms now along with the pool/garden (p/g) view rooms that are in the same hallway of the boardwalk view rooms, (b) then have the standard view rooms done along with all the p/g rooms that are in the same hallway as the standard view rooms, and (c) do any remaining p/g rooms where p/g rooms are on both sides of the hallway (no complete closure of all p/g rooms at the same time is needed in that process). That would mean that the completion of the renovations will likely be sometime in spring 2024, not early March.