Can someone tell me exactly what was done in this refurb? What can I expect to be different this year from last year in a 2 BR villa? I take it by the length, this was a full refurb/
Mostly the bathrooms, very generic looking with the shower in the master totally replaced. Picture on the wall replaced, sleeper sofa, sleeper chair replaced. Island renovated in the kitchen for the flat screen television. Soft goods replaced.Can someone tell me exactly what was done in this refurb? What can I expect to be different this year from last year in a 2 BR villa? I take it by the length, this was a full refurb/
Mostly the bathrooms, very generic looking with the shower in the master totally replaced. Picture on the wall replaced, sleeper sofa, sleeper chair replaced. Island renovated in the kitchen for the flat screen television. Soft goods replaced.
Thanks Deb (or Bill). Any early reports on the pullout sofa? The last ones were worn out but the sleeper chair was extremely comfortable. Also, are there any pic's anywhere that actually show the changes in the bathrooms? Does the second bathroom still have a tub/shower or just a walk in shower? TIA
Agree with this.Just was there for lunch at Olivia's on Friday and buildings 62,63,64 and 15 were blocked off. 16 17 and 18 were done.
Did they replace the kitchen cabinets? They were beginning to show some real signs of wear and tear.Mostly the bathrooms, very generic looking with the shower in the master totally replaced. Picture on the wall replaced, sleeper sofa, sleeper chair replaced. Island renovated in the kitchen for the flat screen television. Soft goods replaced.
Based on their pace, 20-22 should be done within a week or two I would guess.
We had a near HH reservation and I requested anything in 23-26, but was hoping for 23 and got it. 23 is our preferred spot, as it's easy to walk over to the HH, and also gives you bus options between the Peninsular Rd pickup or the pickup at HH (depending on the bus). Peninsular Rd is the first drop off point from the parks, so we would get off there. HH is the last pickup point on the way to the parks, so we'd usually walk over there for pickup (after swinging by Goods to Go for coffee/pop!). We couldn't have been happier...got exactly what I was hoping for!
Do you mind if I ask what room\view in 23?
Thank you for posting. About how long will this renovation take? Just as an estimate, does anyone know when they will be back in service? Thank you!All the buildings in HH (across from the main building) were blocked off on April 9 and building 54.
Hospitality house grand villa is building 25 and those renovations have been completed.We have a grand villa reserved in HH starting tomorrow. Would they actual book us in a room that is not available?? If so, what are my options?
Hospitality house grand villa is building 25 and those renovations have been completed.
Can someone tell me exactly what was done in this refurb? What can I expect to be different this year from last year in a 2 BR villa? I take it by the length, this was a full refurb/
All the buildings in HH (across from the main building) were blocked off on April 9 and building 54.
was it a refurb grand villa? pictures? please and thanks!!!!We have a grand villa reserved in HH starting tomorrow. Would they actual book us in a room that is not available?? If so, what are my options?