Work being done on the Beach?

That is sand that is being dredged from the lake to build the new beach on the other side of the Marina.
 


To the right of the Marina from the land side behind 100/200 loop, the entire area to the left of the Marina will change drastically for the new resort being started
 
To the right of the Marina from the land side behind 100/200 loop, the entire area to the left of the Marina will change drastically for the new resort being started
Why will the beaches be increased behind 100 and 200 loops for something that is being done over in the old River Country area?
 
Because for the next year to year and a half the beach will be closed for construction in that area. It will have the new DVC bungalows along where the current beach is.
 



GET A DISNEY VACATION QUOTE

Dreams Unlimited Travel is committed to providing you with the very best vacation planning experience possible. Our Vacation Planners are experts and will share their honest advice to help you have a magical vacation.

Let us help you with your next Disney Vacation!











facebook twitter
Top