I'm so sorry again to those who have waited so long for bad news. I confess, I am intrigued by this whole idea of the connection between the closing date on the contract and the resulting possibility of a long wait for ROFR, or whether there is no connection at all.
Would those who waited extended times mind posting what the estimated closing date was per your contracts? I'm trying to get a handle on why wait times are so long and whether it really is that they put later closings at the bottom.
I considered adding closing date per contract to the string, but the problem there is that I believe that this slowdown/ backlog is a temporary thing and that those data points would be unhelpful at best when looking at the big picture.
Submitted to ROFR: 3/14, Closing: 5/28, 42 days to taken, DVC Resale Market