Sort of. I'm trying (and I use that word cautiously) to pick apart plans and start to scope out where the junctions of work are between the main contractor, the AV guys, the innovation guys, the 3D model guys and bring some clarity, and start to build an install plan, and make sure nothing gets missed. I usually love this part of my job, as it's trawling through schematic and drawings and getting my nails dirty in the detail. But. I'm on a laptop and only have access to an A4 printer when, I'm used to red penning on at least A2, and preferably A0. Even A3 would be doable. I can't send the files out as they are confidential, so I'm kinda doing the same sort of job as Homer Simpson did on his foundation repair. I've just asked my boss if I can buy an A3 printer and charge it the firm.