That is crazy fast. We redid two 5 x 9 bathrooms, about 5 weeks each. The process was pretty basic. Gut, then repair any damage found. Electrical and plumbing work, then a day wait for the rough in inspection. Sheetrock ,texture and paint. Flooring in. Get the vanity and shower/bathtub vendors in to measure. Another day lost for another inspection. About a two week wait for the vanities and shower/tub surrounds to be made and delivered. Get them installed, then get the countertop and shower door vendors in to measure for the counter tops and doors, only about a week for those to be fabricated, get them installed. Final inspection.
Yeah, this company was good. Recommended to me by a interior design person who had seen the guy's work and his ability to stick to a schedule. He was incredibly detailed oriented and on schedule. He has two crews that work directly for him--no subs. Has his own showroom. He did all the measurements, pre-demo and ordered everything in January. Our job started in late-Feb with all supplies ready and in-storage in his warehouse. Demo crew came in first and demo'ed the first two bathrooms and those two were worked at the same time. Demo team came back and did the other two. I usually had a crew of 3-5 people in my house doing either tile work or cabinetry. We also had some redesign in the master so new drywall, etc. It really was impressive.